Ullage Profiles

The ullage profile for the SIRGE System for each gas contract year is as follows:

Please click the image for a larger version

 

Future modifications may increase capacity/ullage.

The above ullage profile is for the SIRGE System Pipeline from the entry point at the Shetland Gas Plant to the exit point at the FUKA tie-in at the MCP-01 bypass valves. The ullage profile does not indicate ullage in any infrastructure upstream of the entry point or downstream of the exit point. Pipeline capacity is nominally 665mmscfd (18.83MMscmd) and is owned on a divided rights basis.