Ullage Profiles

The ullage profile shown is for the 32" pipeline which runs south from the TP-1 bypass spool to the NSMP St Fergus Gas Terminal. FUKA System (pipeline and terminal) capacity is nominally 36 MMscm/d, but is dependent on pipeline operating conditions and the gas composition of Shipper fields.

Ullage in the TEPUK owned 24” pipeline from the Alwyn North Platform to the TP-1 bypass spool can be found on the TEPUK ICOP website.

Please click the image for a larger version